    Co-op Ethanol Complex Carbon Capture

    Belle Plaine, SK

    • Company Federated Co-operatives Ltd.

    • Industrial Sector Petrochemicals

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Pincher Creek Carbon Sequestration Hub

    Pincher Creek, AB

    • Company West Lake Energy

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    North Drumheller Hub

    Morrin, AB

    • Company Bison Low Carbon Ventures

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Alberta Carbon Grid

    Athabasca, AB

    • Company Pembina Pipeline

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Battle River Carbon Hub

    Coronation, AB

    • Company TransAlta

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    East Calgary Carbon Sequestration Hub

    Rockyford, AB

    • Company Reconciliation Energy

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Bow River Hub

    Cochrane, AB

    • Company InterPipeline

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Rolling Hills Carbon Sequestration Hub

    Cremona, AB

    • Company AltaGas and Whitecap Resources

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Origins CCS Project

    Penhold, AB

    • Company Enhance Energy

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Central Alberta Carbon Hub

    Alix, AB

    • Company Wolf Midstream

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Wolf Carbon Hub

    Chipman, AB

    • Company Wolf Midstream

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Open Access Wabamun Hub

    Spring Lake, AB

    • Company Enbridge

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Brazeau Carbon Sequestration Hub

    Drayton Valley, AB

    • Company Tidewater Midstream

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Ram River Carbon Sequestration Hub

    Nordegg, AB

    • Company Tourmaline

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Tourmaline Clearwater CCUS

    Ricinus, AB

    • Company Tourmaline

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Athabasca Banks Carbon Hub

    Whitecourt, AB

    • Company Vault 44.01

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Rocky Mountain Carbon Vault

    Obed, AB

    • Company Vault 44.01

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Opal Carbon Hub

    Fox Creek, AB

    • Company Kiwetinohk Energy

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Maskwa Project

    Swan Hills, AB

    • Company Kiwetinohk Energy

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Shell Polaris Carbon Capture

    Scotford, AB

    • Company Shell Canada

    • Industrial Sector Oil & Gas Production, Petrochemicals

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Deep Sky Bécancour

    Bécancour, QC

    • Company Deep Sky

    • Industrial Sector Carbon Dioxide Removal

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Atmospheric and Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Deep Sky Thetford Mines

    Thetford, QC

    • Company Deep Sky

    • Industrial Sector Carbon Dioxide Removal

    • Facility Types
      • Capture
      • Storage
    • Facility Status Under Construction

    • CO2 Source Atmospheric

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Belle Plaine Carbon Hub

    RM of Pense, SK

    • Company Whitecap Resources

    • Industrial Sector CO2 Pipeline, CO2 Storage

    • Facility Types
      • Storage
      • Transport
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Atlas Carbon Storage Hub

    Strathcona County, AB

    • Company Shell Canada and ATCO EnPower

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Meadowbrook Hub Project

    Legal, AB

    • Company Bison Low Carbon Ventures

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Capture source dependent

    • Anticipated Annual CO2 Capacity (tpa) 1M+

  • Project/Facility

    Clive CCUS

    Clive, AB

    • Company Enhance Energy

    • Industrial Sector Carbon Dioxide Removal

    • Facility Types
      • Storage
      • Utilization
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) 100k - 500k

  • Project/Facility

    Lindbergh Facility

    Kehewin, AB

    • Company Strathcona Resources

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Orion Facility

    Bonnyville, AB

    • Company Strathcona Resources

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Tucker Thermal Facility

    La Corey, AB

    • Company Strathcona Resources

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Meota East Facility

    Cochin, SK

    • Company Strathcona Resources

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
      • Transport
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Varme Industrial Heartland

    Fort Saskatchewan, AB

    • Company Varme and Gibson Energy

    • Industrial Sector Power Generation

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Glacier Gas Plant CCS Phase 1a and b

    Saddle Hills County

    • Company Entropy

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) 1000 - 100k

  • Project/Facility

    Glacier Gas Plant CCS Phase 2

    Saddle Hills County

    • Company Entropy

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Under Construction

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Pieridae Caroline Carbon Capture Power Complex

    Caroline, AB

    • Company Pieradae Energy

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Heartland Ammonia and Methanol Complex

    Fort Saskatchewan, AB

    • Company Inter Pipeline, Petronas and ITOCHU

    • Industrial Sector Petrochemicals

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Crawford Nickel

    Lower Sturgeon

    • Company Canada Nickel

    • Industrial Sector Mining

    • Facility Types
      • Capture
      • Utilization
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Edmonton Heidelberg Materials’ CCUS Plant

    Edmonton, AB

    • Company Heidelberg Materials

    • Industrial Sector Cement Production

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Moraine Power Generation

    Whitecourt, AB

    • Company GE Vernova

    • Industrial Sector Power Generation

    • Facility Types
      • Capture
      • Transport
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Pembina Low Carbon Complex

    Fort Saskatchewan, AB

    • Company Pembina Pipeline and Partners

    • Industrial Sector Petrochemicals

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Varme Innisfail

    Innisfail, AB

    • Company Varme

    • Industrial Sector Power Generation

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Hinton Bioenergy CCS Project

    Hinton, AB

    • Company Vault 44.01 and Mondi

    • Industrial Sector Carbon Dioxide Removal

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Biogenic

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Alberta Carbon Trunk Line

    NWR/Nutrien site to Clive, AB

    • Company Wolf Midstream

    • Industrial Sector CO2 Pipeline

    • Facility Type
      • Transport
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) 14.6M

  • Project/Facility

    Souris Valley Pipeline

    CAN-US border to near Weyburn, SK

    • Company Souris Valley

    • Industrial Sector CO2 Pipeline

    • Facility Type
      • Transport
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) 3M

  • Project/Facility

    Midale CO2 Pipeline and EOR

    Midale, SK

    • Company Cardinal Energy Ltd.

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Storage
      • Transport
      • Utilization
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) 100k - 500k

  • Project/Facility

    BD3 to Weyburn Pipeline

    Weyburn, SK

    • Company SaskPower and Whitecap Resources

    • Industrial Sector CO2 Pipeline, Oil & Gas Production

    • Facility Types
      • Storage
      • Transport
      • Utilization
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) 1M

  • Project/Facility

    North Star

    Meadow Lake, SK

    • Company Carbon Alpha

    • Industrial Sector Carbon Dioxide Removal

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Biogenic

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Southwest SK Assets

    Swift Current, SK

    • Company Whitecap Resources

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Storage
      • Transport
      • Utilization
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Co-op Refinery Complex

    Regina, SK

    • Company Federated Co-operatives Ltd.

    • Industrial Sector Oil & Gas Production

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Boundary Dam 3 CCS

    Estevan, SK

    • Company SaskPower

    • Industrial Sector Power Generation

    • Facility Type
      • Capture
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) ~1M

  • Project/Facility

    Minnedosa Ethanol Plant

    Minnedosa, MB

    • Company Cenovus Energy

    • Industrial Sector Petrochemicals

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Project CO2ment

    Richmond, BC

    • Company Lafarge

    • Industrial Sector Cement Production

    • Facility Types
      • Capture
      • Utilization
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Lloydminster Upgrader and Refinery

    Lloydminster, AB

    • Company Cenovus Energy

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Pathways Alliance CO2 Transportation and Storage Hub

    Oil Sands to Cold Lake, AB

    • Company Pathways Alliance

    • Industrial Sector CO2 Pipeline, CO2 Storage

    • Facility Types
      • Storage
      • Transport
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Quest CCS

    Scotford, AB

    • Company Shell Canada

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) ~1M

  • Project/Facility

    NWR Sturgeon Refinery CCS

    Redwater, AB

    • Company North West Redwater Partnership

    • Industrial Sector Oil & Gas Production

    • Facility Type
      • Capture
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) ~1M

  • Project/Facility

    Methanex Medicine Hat Carbon Capture

    Medicine Hat, AB

    • Company Methanex

    • Industrial Sector Petrochemicals

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    MEG Christina Lake Carbon Capture

    RM of Wood Buffalo, AB

    • Company MEG

    • Industrial Sector Oil & Gas Production

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Cold Lake Operations CCS

    Cold Lake, AB

    • Company Imperial Oil

    • Industrial Sector Oil & Gas Production

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Path2Zero Expansion Project

    Fort Saskatchewan, AB

    • Company Dow Canada

    • Industrial Sector Petrochemicals

    • Facility Type
      • Capture
    • Facility Status Under Construction

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) 500k - 1M

  • Project/Facility

    Leismer SAGD Bitumen Battery

    Conklin, AB

    • Company Athabasca Oil Corporation

    • Industrial Sector Oil & Gas Production

    • Facility Types
      • Capture
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Exshaw Cement Carbon Capture

    Exshaw, AB

    • Company Lafarge

    • Industrial Sector Cement Production

    • Facility Type
      • Capture
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Deep Sky Alpha

    Innisfail, AB

    • Company Deep Sky

    • Industrial Sector Carbon Dioxide Removal

    • Facility Type
      • Capture
    • Facility Status Under Construction

    • CO2 Source Atmospheric

    • Anticipated Annual CO2 Capacity (tpa) 1k - 100k

  • Project/Facility

    Project Clear Horizon

    Medicine Hat, AB

    • Company City of Medicine Hat

    • Industrial Sector CO2 Storage

    • Facility Type
      • Storage
    • Facility Status Planned

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Edmonton Hydrogen Facility

    Edmonton, AB

    • Company Air Products Canada Ltd.

    • Industrial Sector Petrochemicals

    • Facility Type
      • Capture
    • Facility Status Under Construction

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) TBD

  • Project/Facility

    Redwater CO2 Recovery Unit

    Redwater, AB

    • Company Nutrien

    • Industrial Sector Material Production

    • Facility Type
      • Capture
    • Facility Status Operational

    • CO2 Source Industrial

    • Anticipated Annual CO2 Capacity (tpa) ~350k